• Cross-Functional Approach
    • Engineering
    • Construction
    • Operations
    • Validation
    • Quality Control
    • Quality Assurance
  • Stand alone commissioning and validation schedules
  • Fully integrated engineering, construction, commissioning, and validation schedules
  • Systematic Development
    1. Scope Definition
    2. Critical tasks and deliverables associated with scope
    3. Task Durations
    4. Intra and Inner-System logic based on engineering
  • Preformance Metrics